  1. The BGV Graphite project is being implemented by LLC Pobuzhzhya’s Development
  2. The project involves the construction of a mining and processing plant at the Balakhivka graphite ore deposit and the construction of a plant for the production of spherical graphite (SPG) for lithium-ion batteries
  3. Recognition of the project as strategic for the EU
  4. Our goal is to become part of the supply chain of the global and European electric battery markets
  5. Green Technology in SPG production
BGV Graphite
BGV Graphite

License

BGV Graphite

Reserves

Reserves of the Southern section of the Balakhivka deposit
Proven reserves of the entire Balakhivka deposit
42,4 million tonnes
185 million tonnes

Goals

First stage

The construction of a mining and processing plant for the production of graphite concentrate with an initial capacity of 50,000 tonnes of graphite per year with a baseline quality of C≥95%. It is possible to increase the production capacity of graphite concentrate to 100,000 tonnes per year.

Second stage

The construction of a plant for the production of spherical graphite (SPG) С≥99.95%, which is the basis for the production of anodes for lithium-ion batteries with a capacity of 19,000 tonnes per year.

BGV Graphite

Base production capacities

50 000
tons/year
of graphite concentrate with a baseline quality of C≥95%.

Advantages of the project

  • RICH RAW MATERIAL BASE

    The reserves of the field allow stable operation for 50 years and to increase production capacity depending on the needs of the graphite and graphite-based products market.

    RICH RAW MATERIAL BASE
  • TEAM

    The project team consists of experts with extensive experience in the mining and graphite industries.

    TEAM
  • LOGISTICS

    The industrial facilities are located in a region with well-developed infrastructure and extensive logistics capabilities, including rail connections. Proximity to the EU borders: Romania — 641 km, Poland — 880 km.

    LOGISTICS

Where are we located?

BALAKHIVKA DEPOSIT

of graphite ores is located 1.5 km from the village of Balakhivka in the Oleksandriiskyi district of the eastern part of the Kirovohrad region

BALAKHIVKA DEPOSIT
  • Roads

    Roads

    The region in which the deposit is located is characterized by a highly-developed network of roads. The Oleksandriia — Kryvyi Rih motorway, which is closest to the deposit, is 1.5 km away.

  • Railway and port

    Railway and port

    Several railway stations are located within a 10–25 km radius, namely Korolivka (10 km), Oleksandriia (22 km), and Zhovti Vody (25 km). Mykolaiv seaport is 289 km away and Poland is about 1,000 km away.

  • Access to electricity

    Access to electricity

    The region boasts extensive energy infrastructure with the ability to connect to larger power facilities if needed.

  • Urban-industrial agglomeration

    Urban-industrial agglomeration

    The region of the project adjacent to the Kryvyi Rih urban-industrial agglomeration, where many highly-skilled personnel with extensive experience in the mining industry live. The region boasts a highly-developed network of specialised educational institutions and facilities.

Quality

Quality

Quality
  • Dorfner Anzaplan GmbH developed the enrichmenttechnology.
  • Pilot tests on graphite ore enrichment were conducted in a specialised GTK (Finland) laboratory in the second half of 2023.
  • The basic engineering of the ore-processing plant is being developed by Metso.
  • The SPG pilot tests were completed in November 2024 using the technology of the European companies Netzsch and Dorfner Anzaplan GmbH.
  • Green technology tests in SPG production are due to be completed in July 2025 (American Energy Technologies Company, USA).
  • Test work has been conducted with anode material produced at the Kyiv National University of Technologies and Design (Ukraine). The electrochemical properties of the anode material are on par with those of leading global CSPG manufacturers.

Team

  • Viktor Tanai

    Viktor Tanai

    BGV Graphite Project Manager

  • Vitalii Misiutynskyi

    Vitalii Misiutynskyi

    Director

  • Vita Khizhniak

    Vita Khizhniak

    Head of Foreign Economic Activity

  • Ihor Hamalinskyi

    Ihor Hamalinskyi

    Head of the Technical Department

  • Nataliia Zubchenko

    Nataliia Zubchenko

    Lead Engineer of the Technical Department

  • Vitalii Semeniuk

    Vitalii Semeniuk

    Chief Mineral Processing Specialist

  • Mariia Kurylo

    Mariia Kurylo

    Chief Geologist

  • Yanina Matskiv

    Yanina Matskiv

    Environmental Protection Engineer