  • 2025

    BGV and the EBRD Have Signed Documents to Initiate Strategic Cooperation within the Ukrainian Graphite Project

  • 2025

    The BGV Graphite project has been included in the list of EU strategic initiatives

  • 2025

    Design of the deposit infrastructure and mining and processing plant is in progress.

  • 2025

    The feasibility study for the «Tailings dam and circulating water supply project» has been completed.

  • 2024—2025

    Basic engineering design of the processing plant has been completed.

    Contractor: Metso (Finland).

  • 2024—2025

    The laboratory electrochemical studies of spherical graphite produced from graphite from the Balakhivka deposit are going on.

    The contractor — Kyiv National University of Technologies and Design.

  • 2024—2025

    Testing work on the thermal enrichment of graphite, production of spherical graphite, coating of spherical graphite, and production of batteries is in progress.

    The contractor — AETC (USA).

  • 2024

    Samples of spherical graphite (SPG) have been obtained for the further development of the CSPG production technology.

  • 2024

    The feasibility study section «Geological and industrial characteristics. Mining jperations» has been finalised.

  • 2024

    A geological and economic assessment of the southern section of the Balakhivske graphite deposit (down to a depth of 150 metres) was carried out with the aim of expanding the boundaries of the special permit

  • 2024

    As part of the feasibility study, the calculation of the optimal cut-off grade for graphite was carried out.

  • 2023—2024

    A detailed design has also been completed for the main substation of the deposit — the Graphite substation (35/6 kV).

    The contractor — PrJSC Institute Ukrzakhidenergoproekt (City of Lviv).

  • 2023—2024

    Technical specifications have been received, and a detailed design has been developed for the 35 kV overhead power line supplying the deposit’s main substation.

    The contractor – PrJSC Kirovohradoblenergo.

  • 2023—2024

    Pilot tests for SPG production and chemical purification have been completed.

    The contractor – Dorfner Anzaplan GmbH (Germany), based at the laboratory from Netzsch.

  • 2023–2024

    The enrichment scheme was optimised as a result of pilot tests

    The contractor – Dorfner Anzaplan GmbH (Germany), based at the Finnish GTK laboratory with the involvement of experts from Metso.

  • 2023

    Engineering and geological surveys for design purposes were conducted.

    The contractor – LLC Osnova-Solsif.

  • 2022—2023

    Studies of the environment background condition were conducted.

    The contractor – SI Institute of Environmental Geochemistry of the National Academy of Sciences of Ukraine.

  • 2022–2023

    The calculation of the licence area reserves was performed in accordance with Ukrainian and international standards NI 43–101. The PEA and PFS stages were performed.

    The contractor – M.Plan International Limited (Canada).

  • 2019—2022

    A series of geological exploration works was carried out to confirm the data obtained in the previous stages of geological exploration work, synthesise all the information, and clarify the morphology of ore deposits and quality indicators. 41 wells with a total volume of 5,395 meters were drilled.

    The contractors – LLC Elko-bud (Ukraine) and Pozitif Sanday LTD (Turkey).

  • 2019

    Pre-project work was completed

    The contractor – SE KRYVBASPROEKT State Institute for Enterprise Design in Ore Mining Industry.

OUR PARTNERS

For the development and high-quality implementation of our projects, we collaborate with international companies that are deemed Ukrainian and global leaders in theirfields.

  • Anzaplan
  • m.plan
  • Українська Геологічна Компанія
  • Кривбаспроект
  • UIGG
  • Stars
  • УКРНДІВОДОКАНАЛПРОЕКТ
  • ІГНС
  • K-MINE
  • ТОВ "Елкобуд"